Rural Decentralized WWTP
Location: Jiangxi Province, China
Time: 2014
Total Treatment Capacity: 13.2 MGD
WWTP Type: Integrated FMBR Equipment WWTP
Process: Raw Wastewater–Pretreatment–FMBR–Effluent
Project Brief: This project spans 120 central towns across 10 cities, utilizing over 120 FMBR units with a total treatment capacity of 13.2 MGD. Through a remote monitoring and mobile service station management model, the entire operation and maintenance process can be efficiently managed by a small team.
Location: Zhufang Village, China
Time: 2014
Treatment capacity: 200 m3/d
WWTP Type: Integrated FMBR Equipment WWTP
Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluent
Project Brief:
The Zhufang Village FMBR WWTP began operation in April 2014, with a daily capacity of 200 m³, serving a population of about 2,000. Managed by JDL, the project utilizes Internet Remote Monitoring and a Mobile O&M Station for simple, efficient operation. The plant has run stably, with minimal sludge discharge, no odor, and little environmental impact. The treated effluent consistently meets standards, preventing water pollution and effectively protecting the rural water environment.
International Projects
International Peace Keeping Force
FMBR equipment is now in use across 19 countries, including Italy, Dubai, and Egypt, serving various applications such as military camps, schools, and hotels.

